As a private sector proponent, Liricon/Plenary are best able to design the linear infrastructure which will deliver train services to the communities. The need for stations to be accommodated adjacent to the rail line which follows the CPKC rail alignment provides some limitations to the choice of station locations. However, the municipalities in conjuction with Liricon/Plenary will determine precise station configurations, design and interchanges with local transportation services.
Additional costs beyond those of a basic station will be shared with the relevant community or covered through transit orientated developments (TOD).