The project offers several key benefits: a direct Airport-Downtown alignment, a drastic reduction in development time (10+ years to 1.5 years) with low Capex (<10% of greenfield LRT), minimal construction disruption and environmental impact, improved CPKC freight operation resilience without corridor electrification, and reliable on-time performance with a dedicated passenger rail system.
© 2025 · Friends of CABR